Hot-dip galvanized pressed steel panel tanks for large-volume and fire reserve storage.

Get in touch

Hot Dipped Galvanized Water Tank Manufacturing

Bolted HDG steel water tanks from Dezhou, China

Galvanized Water Tank for High Rise Buildings

In numbers

2–5 mm Pressed steel panel thickness
3,000 m³ Largest listed tank size

Product 01 / 04

Galvanized Water Tank for High Rise Buildings

Manufacturing Solutions

Galvanized steel water tanks for big volumes, bolted on site

Galvanized Bolted Water Tank, Industrial
Hot dipped galvanized water tank on a raised steel stand
Galvanized Water Storage Tank, Drought Relief
Pressed steel panel water tank on an elevated platform

Every galvanized tank is pressed to the drawing, inspected before it ships and packed flat for the container.

HDG galvanized fire water tank on a steel tower at a chemical plant at sunset

As a hot dip galvanized water tank manufacturer in China, LVJIA builds HDG water tanks from one-piece pressed Q235 steel panels. The panels bolt together with non-toxic rubber seals, with no welding on site, into HDG sectional water tanks from 1 m³ to 3,000 m³. Epoxy inner lining and insulation are available for fire reserves, farms, construction sites and industrial storage.

2–5mm Pressed Q235 steel panel thickness, by tank height
0 Welds on site: panels bolt together with rubber seals
Our Services

Why choose LVJIA as your hot dipped galvanized water tank supplier

Fire reserve tanks

Galvanized fire water tanks for buildings, warehouses and sites.

Farm & rainwater tanks

Large, low-cost storage for fields, gardens and villages.

Lined & insulated builds

Epoxy inner coating and insulation layers on request.

Installation support

Assembly drawings and bolt kits for your site team.

Lowest cost per m³

An economical way to store very large volumes of water.

No site welding

Bolted panels with non-toxic rubber seals.

Rust protection

A hot-dip zinc coating protects the steel outdoors.

OEM & ODM builds

Custom sizes, linings and fittings, built to order.

What we run in-house

Core Galvanized Manufacturing
Capabilities

Every HDG water tank starts on the cutting floor of our factory in Wucheng County, Dezhou. Panels are cut, pressed in one piece, punched and bent on one site, so a 1 m³ tank and a 3,000 m³ tank go together the same way.

  • ManufacturingCutting, one-piece panel pressing, punching and bending
  • Production capacityTanks from 1 m³ to 3,000 m³, on 3 production lines
  • Engineering capabilitiesDrawing-based and sample-based custom builds, OEM and ODM
See how we build a tank
LVJIA Galvanized manufacturing
capability
Dezhou · Shandong
11,000 m² factory floor
Manufacturing

Plate cutting

Q235 steel plate cut to panel blanks.

Manufacturing

One-piece pressing

Hydraulic presses stretch-form each panel.

Manufacturing

Punching

Bolt holes punched to one matching pattern.

Manufacturing

Frame & fittings

Steel bases, tie rods and angles are bent and cut in-house.

Production capacity

11,000 m² factory

3 production lines and 25 machines on one site.

Production capacity

1 to 3,000 m³

Panels 2–5 mm thick, chosen by tank height.

Engineering

Drawings for every tank

Layout, fire outlets and connections drawn first.

Engineering

OEM & ODM builds

Custom sizes, linings and insulation.

Engineering

Epoxy lining option

Inner coating for water contact.

Engineering

Flat-packed for export

Crated for the container, bolted together on site.

Advanced Equipment & Technology

The machines behind every LVJIA galvanized steel panel

Production equipment, automation and forming technology. Cutting, hydraulic pressing, automatic punching, bending and robotic handling turn Q235 plate into pressed steel panels that bolt together without welding.

Our Workflow

From steel plate to site in six controlled stages

Hot dip galvanized water tank manufacturing at LVJIA follows the same six stages for every order, and each stage is checked before the next one starts.

01 Stage one

Enquiry & tank drawing

We turn your volume, site and use (fire, farm, drinking or process water) into a panel layout with outlets, ladders and base details for you to approve.

  • Your requirements
  • Tank layout
  • Your approval
Product reference
Galvanized Water Storage Tank, Drought Relief
02 Stage two

Plate selection & cutting

Q235 steel plate is chosen at 2–5 mm, depending on the tank’s height, then cut and weighed out into panel blanks.

  • Q235 steel
  • 2–5 mm
  • Cutting

Lower panels carry the most water pressure, so thicker plate goes at the base.

Product reference
Galvanized Sectional Water Tank, 100 m³
03 Stage three

Panel pressing & punching

Each panel is stretch-formed in one piece on the hydraulic press, then punched with a matching bolt pattern.

  • One-piece pressing
  • Punching
  • Size check
Product reference
Galvanized Sectional Water Tank, 100 m³
04 Stage four

Galvanizing, lining & frame parts

Panels are hot-dip galvanized, with an epoxy inner coating or insulation where the order asks for it. The base channel, tie rods and brackets are cut and bent to match.

  • Hot-dip zinc
  • Epoxy lining
  • Insulation
Product reference
Galvanized Fire Water Tank, High Pressure
05 Stage five

Inspection & testing

Panels, coating and fittings are checked on every order for size, finish and hole alignment. Every product is inspected before it’s packed.

  • Size check
  • Coating check
  • Fittings count

Our galvanized storage tank has a third-party test report (No. SP2630501) from the Dezhou Institute of Product Quality Standards and Metrology.

Product reference
Galvanized Bolted Water Tank, Industrial
06 Stage six

Packing, delivery & site assembly

Panels, bolts, seals and fittings are packed flat for the container and shipped with assembly drawings. On site, the tank bolts together with no welding.

  • Flat-pack crating
  • Container loading
  • Bolt kits
Product reference
Sealed Galvanized Water Tank, Covered
6 stagesOne factory, one inspection routine
100%Finished products inspected before packing
15 days Typical production lead time (working days)
5 regions China, Middle East, Africa, N. America, SE Asia
Related products

Related hot dipped galvanized water tank models

Every hot dipped galvanized water tank below is pressed, bolted and tested on the same line in Dezhou, to the same drawing standard. Hover or tap a card for its specification.

Every hot dipped galvanized water tank is built under a quality system certified to ISO 9001; wetted materials specified against ISO 1461 hot-dip galvanizing.

See all 13 galvanized tanks
Galvanized Bolted Water Tank, Industrial
Material
Hot-dip galvanized steel plate
Type
Pressed sectional water tank
Panel
1000 × 1000 mm
Wall thickness
2 – 5 mm

Galvanized Bolted Water Tank, Industrial

Full details
Galvanized Cooling Water Tank, Tower Basin
Material
Hot-dip galvanized steel plate
Type
Pressed sectional water tank
Panel
1000 × 1000 mm
Wall thickness
2 – 5 mm

Galvanized Cooling Water Tank, Tower Basin

Full details
Galvanized Fire Water Tank, High Pressure
Material
Hot-dip galvanized steel plate
Type
Pressed sectional water tank
Panel
1000 × 1000 mm
Wall thickness
2 – 5 mm

Galvanized Fire Water Tank, High Pressure

Full details
Galvanized Mining Water Tank
Material
Hot-dip galvanized steel plate
Type
Pressed sectional water tank
Panel
1000 × 1000 mm
Wall thickness
2 – 5 mm

Galvanized Mining Water Tank

Full details
Galvanized Rainwater Tank, 10,000 Litre
Material
Hot-dip galvanized steel plate
Type
Pressed sectional water tank
Panel
1000 × 1000 mm
Wall thickness
2 – 5 mm

Galvanized Rainwater Tank, 10,000 Litre

Full details
Galvanized Sectional Water Tank, 100 m³
Material
Hot-dip galvanized steel plate
Type
Pressed sectional water tank
Panel
1000 × 1000 mm
Wall thickness
2 – 5 mm

Galvanized Sectional Water Tank, 100 m³

Full details
Galvanized Water Reservoir Tank, Warehouse
Material
Hot-dip galvanized steel plate
Type
Pressed sectional water tank
Panel
1000 × 1000 mm
Wall thickness
2 – 5 mm

Galvanized Water Reservoir Tank, Warehouse

Full details
Galvanized Water Storage Tank, Drought Relief
Material
Hot-dip galvanized steel plate
Type
Pressed sectional water tank
Panel
1000 × 1000 mm
Wall thickness
2 – 5 mm

Galvanized Water Storage Tank, Drought Relief

Full details
Galvanized Water Tank for High Rise Buildings
Material
Hot-dip galvanized steel plate
Type
Pressed sectional water tank
Panel
1000 × 1000 mm
Wall thickness
2 – 5 mm

Galvanized Water Tank for High Rise Buildings

Full details

Built from the right materials.Specified for every hot dipped galvanized water tank.

Steel plate, zinc coating, linings, seals and bolts. Every part of an LVJIA galvanized steel water tank is chosen for strength, outdoor life and fast assembly.

Request material datasheet

32 materials and parts in a typical build.
Grades adjusted to your specification.

Materials we build with

Technical details

Hot dipped galvanized water tank
SpecificationDetailStandard
Steel gradeQ235 carbon steel plateGB/T 700
Panel thickness2–5 mm by tank heightFactory spec
Corrosion protectionHot-dip galvanized; epoxy inner lining optionFactory spec
Tank capacity1–3,000 m³Listed range
Panel formingStretch-formed in one pieceFactory spec
JointsBolted with non-toxic rubber pads, no weldingFactory spec
CertificationCE for water tanksICR/VC/HS2506113
Galvanized Bolted Water Tank, Industrial

Inspection
Methods

Size, coating and hole checks on every panel before packing.

ISO 45001
LVJIAQuality assured
Inspection report
  • Plate grade & thickness
  • Panel profile & size
  • Galvanized coating
  • Bolt-hole alignment
  • Seals & bolt kit count

5 of 5 checks passed

Request full report +
100% Panels inspected

Testing Equipment

Thickness gauges and coating checks in the factory, plus a water-fill test after site assembly.

OEM & ODM · Custom builds

Custom Hot Dipped Galvanized Water Tank Manufacturing

From a 1 m³ site tank to a 3,000 m³ fire reserve, we lay out each bolted galvanized water storage tank around your ground, outlets and access, and add epoxy lining, insulation or partitions where the job needs them.

Our engineers work from your drawing, a sample or just your requirements. We support OEM and ODM orders and stay with the project from layout through inspection and delivery.

Applications & Customer Feedback Where the hot dipped galvanized water tank works

Where our galvanized tanks are used, what each job needs, and what verified buyers say about working with us.

1 / 2

We’ll help you meet your water storage goals.

Ready to start
your project?

Tell us the volume, the site and the water use. We’ll come back with a drawing and a price.

Get in touch
Galvanized Water Reservoir Tank, Warehouse Galvanized Water Tank for High Rise Buildings

“Delivery: great. Design: perfect fit. Service: excellent service from Lvjia Guan!”

E***n, Netherlands · verified purchase
5.0 verified buyer rating
Galvanized tank FAQ

Hot dipped galvanized water tank questions, answered by the factory

The questions buyers ask us most often before a hot dipped galvanized water tank is quoted, answered with the figures our own inspection sheets use.

Ask our engineers
What is a hot dipped galvanized water tank?

A hot dipped galvanized water tank is a bolted, sectional tank built from Q235 carbon steel panels that are stretch-formed in one piece and then dipped in molten zinc. Because the zinc is applied by immersion rather than sprayed on, it alloys with the steel and coats both faces and every cut edge, including the inside of the bolt holes. Hot dipped galvanized water tank panels bolt together with non-toxic rubber pads and no welding, so the tank can be assembled inside an existing plant room and a damaged panel can be swapped without cutting the shell.

What capacities and plate thicknesses can I order?

A hot dipped galvanized water tank is built to order from 1 m³ up to 3,000 m³. Panel thickness follows the water height rather than the volume: 2 mm on shallow tanks, rising through 3 mm and 4 mm to 5 mm where the head and the hydrostatic load demand it. Because the panels are modular, the tank is shaped to the room you have — long and low for a basement, tall and square for a yard. Send the footprint, the head and the duty and the factory returns an arrangement drawing with the panel schedule.

Which steel grade and standard do you build to?

Panels are pressed from Q235 carbon steel plate to GB/T 700, the Chinese structural carbon steel standard, and the zinc layer follows hot-dip galvanizing practice as set out in ISO 1461. The plate is stretch-formed in a single stroke, which work-hardens the panel and gives it its stiffness without any welded ribs. Mill certificates for the plate and coating-thickness readings for the zinc are issued with each order, so a consulting engineer can check a hot dipped galvanized water tank against the specification before it ships.

Do I need an internal lining?

For raw water, irrigation, construction and most fire reserves the galvanized surface of a hot dipped galvanized water tank is the finish and no lining is needed. An epoxy inner lining is offered as an option where the stored water is aggressive, where a long dwell time is expected, or where a client specification calls for a barrier coating over the zinc. LVJIA also supplies a hot dipped galvanized water tank with a food-grade liner bag for potable duty. Tell us the water analysis and the intended turnover and the right option is quoted rather than guessed.

How long will the zinc coating last outdoors?

Hot-dip galvanizing corrodes at a predictable, slow rate, so service life is a function of coating thickness and the local atmosphere — decades in a rural or suburban setting, less in heavy industrial or marine air. Because the coating is metallurgically bonded it cannot peel or blister the way paint does, and a scratch stays protected because the surrounding zinc is sacrificial. For coastal or industrial sites the panel thickness and the zinc weight on a hot dipped galvanized water tank can both be increased at quotation stage.

Can it be used for fire water storage?

Yes, and it is one of the most common duties. A hot dipped galvanized water tank is frequently specified as a sprinkler or hydrant reserve for warehouses, factories and high-rise buildings because it is strong, fast to erect and easy to inspect. Sealed covers, a vented manhole and a separate suction connection with an anti-vortex plate are all standard options. Every finished tank is filled and held at full head before packing, and 100 per cent of finished product is inspected, so the reserve is proven watertight before it leaves Dezhou.

How long does manufacturing and delivery take?

Production runs through six controlled stages — enquiry and drawing, plate cutting, stretch forming, punching and fittings, inspection and testing, then packing and delivery — in about 15 working days from drawing approval. Panels ship flat-packed on pallets, so a hot dipped galvanized water tank bound for the Middle East, Africa, North America or South-East Asia freights no worse than a stack of plate and clears customs as steel sections rather than as an assembled vessel. Bolts, gaskets, ladders and fittings are packed with every hot dipped galvanized water tank as one kit.

Start your project

Need a hot dipped galvanized water tank sized to your site?

Send us your drawing, or just the volume and use. Our engineering team will come back with a panel layout, a quote and a build plan.