Delivery: great. Quality: looks good. Design: perfect fit. Service: excellent service from Lvjia Guan!
Sectional panel GRP tank · 10,000 L
A modular galvanized water tank built on a standard panel grid — sized to the space now and extended on the same grid later.
Indicative — the quotation confirms the final figure US$3,600 Lead time within 15 working days · ex Dezhou, Shandong
SKU LVJ-HDG-MOD
What buyers said once the tank was on site — every review left on our Alibaba store, in their own words.
Delivery: great. Quality: looks good. Design: perfect fit. Service: excellent service from Lvjia Guan!
Sectional panel GRP tank · 10,000 LPanels arrived complete and flat-packed. Assembled on site inside nine days.
Spliced rectangular GRP tank · 10,000 LPotable storage that finally fits the plant room, and not a single leak.
Sectional panel GRP tank · 50,000 LRainwater tank landed on the promised date and every fitting matched.
SMC panel GRP tank · 100 m³Fire reserve built exactly to our drawing. The quality is solid.
Heavy-duty square GRP tank · 50 m³A big tank in one container, and nothing missing from the packing list.
Combined panel GRP tank · 200 m³The food-grade lining passed our inspection without a single note.
Modular GRP sectional tank · food gradeGalvanising still clean and bright after a full rainy season.
Hot-dipped galvanized tank · 200 m³Neat stainless finish and the seams are tight all the way round.
Stainless steel water tank · 60 m³Holds temperature far better than the tank we took out.
Insulated GRP water tank · 20,000 LThe underground install went smoothly and the sealing was good.
BDF underground water tankQuoted fast, shipped fast. We will be ordering again.
WRAS approved GRP tank · 10 m³The modular galvanized water tank from LVJIA is built on the Hot Dipped Galvanized panel system at our own plant in Dezhou, Shandong. Demand rarely stays where it started, and a modular tank is the one that can follow it.
A modular galvanized water tank is a pressed steel sectional tank finished by hot-dip galvanising after the panels are formed. That order matters: because the zinc goes on last, it covers every edge, bolt hole and stiffener the press leaves behind, instead of cracking off a pre-galvanised sheet the moment it is stamped. LVJIA builds it from 1 to 3000 m³, or 125 litres to 500,000 litres, on a bolted panel system.

Because every panel is the same 1 m module bolted on the same flange pattern, the tank is a grid rather than a fixed vessel. Capacity is set by how many modules are used, so a scheme can be built for today and extended in a later phase by unbolting one wall and carrying it outward. Spares are interchangeable for the same reason: a damaged panel anywhere in the tank is replaced from stock rather than fabricated to order.
Panels are pressed from 2 to 5 mm steel plate, ribbed for stiffness, then dipped whole in molten zinc. The coating is metallurgically bonded rather than painted on, so it does not peel and it keeps protecting the steel at a scratch. Joints are bolted through an external flange onto a food-grade gasket, and the tank ships flat in a plywood box or on an iron bracket. The plant is certified to ISO 9001, ISO 14001 and ISO 50001, and the product carries CCC.
| Model number | Galvanized Water Tank |
|---|---|
| Material | Hot-dip galvanized steel plate |
| Type | Pressed sectional water tank |
| Installation | Bolted |
| Wall thickness | 2 – 5 mm |
| Operating temperature | 0 – 100 °C |
| Scope of application | Fire water, domestic water, drinking water |
| Water storage capacity | 1 – 3000 m³ |
| Specification | 125 L – 500,000 L |
| Transport package | Plywood box, iron bracket or nude |
| Certification | ISO 9001 · ISO 14001 · ISO 50001 · CCC |
| Origin | Dezhou City, Shandong Province, China |
A hundred cubic metre tank is typically 8 × 5 × 2.5 m on a 1 m grid. The system runs from 1 to 3000 m³ with a 2 to 5 mm wall.
| Tank height | Panel thickness | Typical use |
|---|---|---|
| Up to 1.5 m | 2 mm | Shallow or roof tank |
| 2.0 m | 3 mm | Standard sectional tank |
| 3.0 m | 4 mm | Deep tank, high static head |
| 4.0 m and above | 5 mm | Maximum height, braced |

Every modular galvanized water tank is filled and held at full head before it leaves the factory, and no joint is allowed to weep. The plant is certified to ISO 9001 and the inspection certificate ships with the order; the full set is on our certifications page. The same specification is published on our Made-in-China storefront, where LVJIA is an audited supplier with a 5.0 store rating on Alibaba, 100% on-time dispatch and a response time under one hour.
Pricing for the modular galvanized water tank starts at US$200 per m³, falling to US$180 from 10 and US$150 from 50, FOB Tianjin or Qingdao. The minimum order is one set and lead time is within 15 working days from Dezhou, Shandong. If a later extension is likely, say so at order stage so the end wall is built as a removable bolted section.
Send the capacity you need and the space you have, and LVJIA returns an arrangement drawing with the panel schedule before you commit to anything. Our engineers answer specification questions directly through technical help, and the rest of the range sits on the Hot Dipped Galvanized water tank page.
Same job, different material: the enamel modular water tank is the same tank in glass-fused-to-steel, for sites where the surface must never be relined, while the modular GRP water tank builds it in moulded GRP. Elsewhere in the hot dipped galvanized range there is the galvanized bolted water tank for bolted assembly inside a finished building and the galvanized fire water tank for fire reserves.
At a glance
A hundred cubic metre tank is typically 8 × 5 × 2.5 m on a 1 m grid. The system runs from 1 to 3000 m³ with a 2 to 5 mm wall.
Panel thickness by tank height — Modular Galvanized Water Tank, 100 m³
| Tank height | Panel thickness | Typical use |
|---|---|---|
| Up to 1.5 m | 2 mm | Shallow or roof tank |
| 2.0 m | 3 mm | Standard sectional tank |
| 3.0 m | 4 mm | Deep tank, high static head |
| 4.0 m and above | 5 mm | Maximum height, braced |
LVJIA has pressed water-tank panels in Dezhou since the plant opened, and holds ISO 9001 with import and export rights of its own.
Request a quotePanels are pressed from 2 to 5 mm steel plate, ribbed for stiffness, then dipped whole in molten zinc. Because the dip comes after forming, the coating reaches the places a pre-galvanised sheet leaves exposed.
Product dimensions
Tolerance requirements
Every tank is filled and held at full head before dispatch and no joint is allowed to weep. Zinc coating weight is checked on each batch.
Typical performance — Modular Galvanized Water Tank, 100 m³
| Test | Method | Result |
|---|---|---|
| Hydrostatic | 48 h at full head | No weep at any joint |
| Coating | Zinc weight check per batch | Pass |
| Certification | ISO 9001 · 14001 · 50001 · CCC | Held |
Send the capacity you need and the space you have, and LVJIA returns an arrangement drawing with the panel schedule before you order.
Talk to an engineerHow every tank is specified, built to your drawing, inspected and documented before it leaves the line.
We’ll help you meet your specification.
Send us a drawing or a capacity and we will come back with a specification, a price and a build slot.
Get in touchTanks our customers pair with this one. Hover or tap a card for its specification.
See the full catalog
Hỏi về sản phẩm này
Tell us the capacity and the space you have. An engineer replies with a drawing and a firm price.
Trao đổi với kinh doanh và kỹ thuật
Straight to the engineers who press the panels. First reply usually under two hours on a working day.
Shandong Lvjia Air Conditioning Equipment Co., Ltd. · Dezhou, China